Industrial projects |
به نام خداوند جان و خرد سخنی از قرآن کریم |
Industrial Experiences: · Finite Element Modeling and Analysis of a Gearbox Cap, Hastia Rail Way Corporation, 2008. · Finite Element Modeling and Analysis of a complete Train Car, RAJA Rail Way Corporation, 2006. · Supervising the Know-How Development, Design and Manufacturing of Shaft and Rotor for Three different Types of Gas Turbines, Iran Oil Ministry, 2005-2008. · Design and Manufacturing of the Mold for ABB Gas Turbine Blade, Stage 4, Badr System Co., 2006. · Engineering, Procurement, and Construction (EPC) of the Surimi Production Plant, Shad-Chin Co., 2004 · Design of a Packaging System, Homogenized Pegah Milk Production Co., Tehran, Iran, (1999). · Design of a Packaging System and Optimization of Production Line, Minoo Industrial Corp., Tehran, Iran, (1999). · Supervision-Consultation on the Design of Banki-Turbine, Sharif Univ. of Technology, (1988-1989). · Mechanical Design and Construction of Mini-Hydro Power Stations, Ministry of Reconstruction, I.R. of Iran, (1988-1989). · Reverse Engineering of knitting machines, Ministry of Reconstruction, I.R. of Iran, (1985-1986). |